Introduction
In September 2009 I started with my master programme Building Physics and Systems, nowadays called Building Physics and Services. Part of this master education is a portfolio plan, which I wrote September 2010. The reason for this delay is that my bachelor programme wasn’t finished yet in September 2009 so during this year I had to finish multiple courses which didn’t belong to my master’s programme. From September 2010 I started full time with the master, so the portfolio plan had to be written.
At this moment, I am almost finished with executing this plan. I already started my graduation project and only one (part of a) mandatory course has to be completed. It is time to reflect on my portfolio plan and the choices I have made during these years.
Summary of the portfolio plan
Courses and projects:
Compulsory course elements
|
7S532
|
Heat and moisture transfer in building envelopes & exercise (exercise needs completion)
|
|
7S650
|
Structure-borne sound in buildings
|
|
7S750
|
State of the art in building performance simulation for integrated solutions
|
|
7S801
|
Computational building physics and systems using matlab
|
|
7S815
|
Design of sustainable energy systems for the built environment
|
|
7S892
|
CFD for building engineering
|
|
7S612
|
Roomacoustics
|
|
7S620
|
Sustainable technology
|
|
7S630
|
Lighting technology
|
|
7S632
|
Lighting technology, exercises
|
Optional course elements
|
0H530
|
Sound perception
|
|
4P510
|
Renewable Energy Sources
|
|
7R750
|
Organisatie en cultuur van het bouwbedrijf
|
|
7T750
|
Productontwikkeling (industrie en bouwmarkt)
|
|
7T810
|
Integraal ontwerpen
|
|
0E920
|
Vastgoedrecht
|
Projects
|
7SS15
|
M1 - Design assignment: Drijvend podium achter van Abbe museum
|
|
7SS25
|
M2 - Sustainable Energy Technology (SET) project
|
|
7SS45 7SS37
|
M3 + Graduation - Graduation project at Laboratory of Acoustics
|
Competencies:
| 1. |
Try to discover my favorable subject of interest: Acoustics or Sustainable design
|
| 2. |
Gain more knowledge in acoustics and in the building process in total
|